Perinatal Suite Bootle, Refurbishment Works

CHALLENGE

MJ Quinn was tasked with delivering a comprehensive refurbishment of the Perinatal Suite within a live healthcare environment. The challenge involved modernizing outdated infrastructure while ensuring full compliance with NHS technical standards, maintaining operational continuity, and integrating advanced mechanical and electrical systems within a constrained third-floor layout

KEY ISSUES ADDRESSED

Legacy Infrastructure Integration:

Existing electrical and mechanical systems required adaptation
to support modern healthcare technologies without full
replacement

Compliance with NHS Standards:

All installations had to meet stringent NHS specifications,
including HTMs, HBNs, and BS regulations for safety, hygiene,
and performance.

Minimising Disruption in a Live Environment:

Works were carefully phased to avoid interference with ongoing hospital operations, including out-of-hours work for service tie-ins.

Complex Service Coordination:

Electrical, HVAC, plumbing, and data systems needed precise coordination to avoid clashes within ceiling voids and partition walls.

SOLUTION

MJ Quinn delivered a fully integrated mechanical and electrical refurbishment at the Perinatal Suite.
Electrical works included new sub-mains, LED lighting, emergency call points, CCTV, fire alarms, and access control – each aligned with NHS safety and anti-ligature standards.
Smart distribution boards and clearly labelled accessories supported future maintenance and scalability.
Mechanical upgrades featured a VRF air conditioning system with touchscreen controls, enhanced ventilation via ERV units and CO sensors, and rebalanced heating with new insulated pipework. Hot and cold-water services were rerouted and chlorinated to meet potable standards.
Digital modelling ensured smooth coordination across disciplines, with all systems commissioned to CIBSE and BSRIA standards and full O&M documentation provided.

CONCLUSION

The Perinatal Suite refurbishment at Bootle stands as a model of precision engineering and healthcare compliance. MJ Quinn successfully delivered a future-proofed, energy efficient
environment tailored to clinical needs, all while maintaining operational integrity throughout the build. The project reflects the company’s commitment to quality, safety, and innovation in healthcare infrastructure.

Contact us

At MJ Quinn we believe new projects should be undertaken with great amount of consideration, planning and research.